TRC project contact
Contact TRC Hydraulic Hose Equipment Manufacturer
TRC manufactures hydraulic hose assembly equipment and manages overseas projects from application review through factory production, inspection coordination and delivery. Send the assembly, workload and operating conditions needed to confirm a machine family, die configuration or commercial scope.

Direct contact
Send Your Project to the Right Team
Email works best for specifications and files. Phone or WhatsApp is suitable for a quick first discussion, but model confirmation still needs the application data below.
Best for photos, drawings, product lists, crimp specifications and project documents.
Use for quick pre-sales coordination or to confirm which technical records to send.
Huangge Town, Nansha District
Guangzhou, China
Office visits and production-facility audit arrangements are confirmed separately in advance.
Send TRC Your Project Details
Complete the fields you already know. The checklist below explains which assembly, workload, power and destination details help TRC review the model, tooling and commercial scope.
Project brief checklist
What to Send for Equipment Selection
A hose-size message is not enough to confirm compatibility. Send the assembly system and the site conditions together.
Inquiry routing
Keep Commercial, Technical and Support Questions Separate
Each route needs different evidence. This helps the request reach the person who can answer it without losing technical context.
Model and Quotation
Start with the workpiece, equipment task, location, output and utilities.
- Crimp, cut, skive, clean or test
- Machine and tooling scope
- Destination and commercial terms
Technical Review
Send component and target data before asking whether a machine or die will work.
- Hose, fitting and ferrule IDs
- Crimp specification and geometry
- Sample or validation requirement
Fault or Spare-Part Support
Identify the machine and record the condition before parts or corrective action are proposed.
- Model, serial/order reference
- Power, control and die state
- Fault sequence, photos and video
What happens next
A Four-Step Review Before Production
Customization or sample validation is confirmed before manufacturing begins, not added after the order scope becomes ambiguous.
Completeness Check
TRC checks whether the submitted workpiece and site information is sufficient.
Technical Shortlist
The application route narrows the machine family, tooling and remaining questions.
Configured Quotation
The quotation identifies model, voltage, controls, dies, accessories and commercial scope.
Pre-Production Confirmation
Any customization, sample check, documentation or acceptance need is agreed first.
Resources before inquiry
Choose the Guide That Matches Your Decision
Use one route before contacting TRC when the machine type, complete equipment scope or quotation inputs are still unclear.
How to Choose
Work through hose, fitting, ferrule, output, power and loading-space inputs.
Use the selection guide →Complete setupStarter Kit Planning
Separate essential crimping, cutting and measurement equipment from conditional cleaning, skiving and testing needs.
Plan the equipment chain →Quote readyConfigured Quotation
Prepare the model, dies, utilities, options, evidence, destination and commercial scope for comparison.
Review quotation inputs →Contact FAQ
Questions That Help Us Start With the Right Evidence
Can I get a quote with only a photo of my hose?
A photo can start the conversation but usually cannot confirm reinforcement, fitting series or target crimp data. Add part numbers, measurements and the valid assembly specification where possible.
What should I send if I need replacement dies?
Send the machine model, current die series and markings, required finished crimp range, hose and fitting data, and clear photos of the mounting geometry.
What details help diagnose a crimp leak?
Send hose and fitting identification, ferrule, insertion method, die used, target and measured crimp diameter, leak location, pressure and temperature conditions, plus photos of the failed assembly. Depressurize the system before inspection.
Can TRC help plan a complete hose workshop?
Yes. Include the hose range, fitting systems, output, space, utilities, cleanliness and testing process, destination and budget stage. TRC can separate essential equipment from later expansion items.
Send your project brief
Attach the Specification. Let the Application Decide the Equipment.
Include representative assembly photos or drawings and the checklist fields above. For after-sales support, add the machine record and a clear fault sequence.
